Al-Khair Port, which is specialized in handling petroleum products at Port Sudan Harbor has been witnessing regular arrival and unloading of petroleum products tankers.
A tanker carrying 5046 tons cooking gas and another one loaded with 48598 tons of furnace were unloaded.
Meanwhile, the waiting area outside the port received three gasoline tankers with a total load of (71,444) tons, and a cooking gas tanker with a load of 5504 tons.
The two tankers are waiting for completion of the procedures required before entering to unloading docks inside the port.
The Director of Al-Khair Port, Captain Rami Omer Seyam, affirmed in statement to SUNA that the port is ready to receive and unloading all petroleum products tankers that would arrive to the port.